Cable sizing calculation comes down to five checks: work out the load current, derate the cable for heat and grouping, pick a size from the manufacturer's table, confirm the voltage drop, and make sure the conductor survives a short circuit. The cable you end up with is the smallest one that passes all five, not the one that carries the current on a cool day. It's one of the core steps in electrical design for buildings, and this post takes it on its own. 

Most students stop at step one. Site engineers know better.  NCRB's 2022 report  counted 7,566 accidental fires in India, and 1,567 of them were blamed on electrical short circuits. That's roughly one in five. Not every one is a sizing mistake, of course. But an overheated, undersized cable is exactly how a quiet summer afternoon turns into a melted terminal. So let's size one feeder properly, start to finish.

The 3 checks in cable sizing

Every cable has to clear three hurdles. Students usually clear one.

CheckThe question it asksThe test
Current ratingCan the cable carry the load without overheating, after derating?Ib ≤ In ≤ Iz
Voltage dropDoes enough voltage reach the far end?About 3% lighting, 5% power
Short-circuit withstandDoes the conductor survive until the breaker trips?I²t ≤ k²S²

Ib is the design current, In is the breaker rating, and Iz is the cable's derated current rating. Short runs usually fail the first check. Long ones, say 100 m from a basement panel to a terrace pump, fail the second. The third bites when a thin cable sits close to a strong transformer.

Step 1: Load current

Start with the current the cable must carry, the design current (Ib). Take the power from your electrical load calculation, then use these cable size calculation formulas:

Single-phase: Ib = P / (V × pf), with V = 230 V Three-phase: Ib = P / (√3 × V × pf), with V = 415 V

P is in watts, V in volts, Ib in amperes. For motors, P is the shaft output, so divide by efficiency (η) too: Ib = P / (√3 × V × pf × η). That's the whole of a three phase cable size calculation.

A 30 HP motor is about 22 kW (1 HP = 0.746 kW). At 415 V, pf 0.86 and η 0.92: Ib = 22,000 / (1.732 × 415 × 0.86 × 0.92) = 38.7 A. If the nameplate gives full-load current, use that instead. Nameplate beats formula, every time.

Step 2: Derating factors

This is where most students slip. A catalogue rating is only true under reference conditions. Cables rated to IS 3961, the Indian current-rating standard, quote 40°C air and 30°C ground. IEC tables, the ones in most textbooks and in IEC 60364-based Gulf specs, start from 30°C air and 20°C ground. Same cable, different starting line. Match your factors to your table's base, and never apply the 40°C correction twice.

Cable derating factors come from three things:

  • Ambient temperature (Ca). Basement plant rooms and terrace trays run hot.
  • Grouping (Cg). Cables sharing a tray heat each other.
  • Laying method and surroundings (Ci). Conduit, buried, thermal insulation, soil resistivity.

Temperature factors, rebased to a 40°C reference (from IEC 60364-5-52 values; indicative):

Ambient airXLPE (90°C)PVC (70°C)
40°C1.001.00
45°C0.960.91
50°C0.900.82
55°C0.840.70

For multi-core cables touching in a single layer on a perforated cable tray, the grouping factor is 0.88 for 2 circuits, 0.82 for 3, 0.77 for 4 and 0.73 for 6. Enclosed in conduit it's harsher: about 0.70 for three circuits, 0.55 for six.

Then: Iz = I_table × Ca × Cg × Ci. Flip it to size the cable: required table rating = Ib / (Ca × Cg × Ci).

One more thing nobody tells you. A terrace tray in May sun is worse than any plant-room number above. A common rule of thumb adds around 20°C for direct sunlight. Shade it, or derate for it.

Step 3: Select from the manufacturer's table

Now open the manufacturer's catalogue and pick the smallest size whose tabulated rating meets the figure from Step 2. In plain words, that's how to calculate cable size in sq mm for the heat check. The cable current carrying capacity in the catalogue is only the starting point.

Insulation matters. XLPE (IS 7098 Part 1) runs at 90°C conductor temperature, PVC (IS 1554 Part 1) at 70°C, so XLPE carries more at the same size. Here's a cable size chart to get a feel for it. These are typical values for 3.5/4-core XLPE armoured cables rated to IS 3961 (Part 6):2016 at 40°C air. Use your own supplier's table for real work.

Size (mm²)Copper in air (A)Copper buried (A)Aluminium in air (A)
4414532
6525642
10707454
16899569
2511912293
35147146114
50179173138
70226212175
95279254216

Step 4: Voltage drop check

A cable can carry the current happily and still starve the equipment at the far end. This voltage drop calculation catches that:

ΔV = √3 × Ib × L × (R cosφ + X sinφ) for three-phase. For single-phase, swap √3 for 2.

L is in km, R and X in Ω/km (use R at 90°C for XLPE), ΔV in volts. Divide by supply voltage and multiply by 100 for the percentage. Catalogues also list mV/A/m, which gives ΔV = (mV/A/m × Ib × L) / 1000, with L in metres.

What's the limit? Most Indian project practice follows IEC 60364-5-52: about 3% for lighting and 5% for other circuits, measured from the origin of the installation to the farthest load. Older IS 732 text and some client specs are tighter, so the project spec wins. Also, Indian supply rules let the incoming LT voltage itself drift by roughly ±6%, so don't burn the whole budget inside the cable. If you want to see how those lighting circuit loads are worked out in the first place, our lighting design basics on lux levels and fixture layout covers it.

Motors need a second look. They draw roughly 5–7 times full-load current while starting, and long motor feeders are where that dip hurts. Check it separately.

Step 5: Short-circuit withstand check

A cable that's fine at 39 A can cook at 15,000 A if the breaker is slow. The test:

S ≥ (I × √t) / k, the same thing as I²t ≤ k²S².

S is the conductor area in mm², I the prospective fault current in A (rms), t the clearing time in seconds (valid up to about 5 s). The constant k depends on the metal and insulation: copper/XLPE 143, copper/PVC 115, aluminium/XLPE 94, aluminium/PVC 74.

Where does I come from? The fault level at the panel, which you'll see marked on the single line diagram for the project. As an upper bound, a 1,000 kVA, 5% impedance transformer gives about 28 kA at 415 V (kVA / (√3 × V × Z)). For t, read the breaker's let-through I²t from its datasheet instead of guessing. MCCBs often clear far faster than the textbook number.

Worked example: one feeder, every step

A Pune office tower has a 22 kW (30 HP) chilled-water pump in the basement plant room. The LT panel is 110 m away. The cable runs on a perforated tray with three other circuits, touching, single layer. The plant room hits 45°C in summer. Supply: 415 V, three-phase, 50 Hz. We'll use 4-core armoured XLPE copper cable.

Step 1, current. Ib = 22,000 / (1.732 × 415 × 0.86 × 0.92) = 38.7 A.

Step 2, derating. XLPE at 45°C gives Ca = 0.96. Four circuits on a tray give Cg = 0.77. Combined: 0.96 × 0.77 = 0.74. Required table rating = 38.7 / 0.74 = 52.3 A.

Step 3, select. 6 mm² is rated 52 A in air. Short by 0.3 A, and close enough to tempt you. Don't. 10 mm² is rated 70 A, so Iz = 70 × 0.74 = 51.8 A, well above 38.7 A. The breaker window is 38.7 A ≤ In ≤ 51.8 A, so a 40 A or 50 A motor-duty breaker, plus an overload relay set near nameplate current.

Step 4, voltage drop. For 10 mm²: R = 2.33 Ω/km, X = 0.084 Ω/km, cosφ = 0.86, sinφ = 0.51. ΔV = 1.732 × 38.7 × 0.110 × (2.33 × 0.86 + 0.084 × 0.51) = 15.1 V, which is 3.6% of 415 V. That's inside 5% overall, but say this feeder only gets a 3% share (12.45 V) because the sub-main upstream used the rest. So 10 mm² fails. Try 16 mm²: R = 1.47, X = 0.080. ΔV = 1.732 × 38.7 × 0.110 × (1.47 × 0.86 + 0.080 × 0.51) = 9.6 V, or 2.3%. Pass.

Step 5, short-circuit. Say the panel fault level is 15 kA and the breaker datasheet shows clearing in about 0.02 s at that current (illustrative numbers). S ≥ 15,000 × √0.02 / 143 = 14.8 mm². The 16 mm² cable passes, just.

Result: 4C × 16 mm² copper XLPE armoured. The heat check said 10 mm². Voltage drop said 16. The bigger one wins. At 16 mm², Iz = 89 × 0.74 = 66 A, so the 40 A or 50 A breaker still fits.

Practise cable sizing on real projects in the MEP design course.

Copper vs aluminium cables

Copper vs aluminium cable is mostly a resistance story.

At 25 mm², Indian-standard catalogue data lists 0.727 Ω/km for copper against 1.20 Ω/km for aluminium, about 65% higher.

Aluminium also carries less current at the same size. In the chart above, 25 mm² aluminium manages 93 A in air against 119 A for copper, around 78%. So aluminium usually goes up a size, sometimes two, to match heat and voltage drop. (35 mm² aluminium is 114 A, still short of 119.)

Why use it then? It's about a third of the weight (density 2,700 vs 8,900 kg/m³) and usually cheaper on big feeders. That's why risers and incomers are often aluminium while final circuits stay copper.

Terminations decide whether it lasts. NBC cautions against aluminium below 16 mm² because small sizes overheat at the terminals. Copper-to-aluminium joints need bimetallic lugs, and aluminium-to-aluminium joints need anti-oxidant compound. A loose aluminium lug is how feeders end up as news.

Common mistakes

  • Double derating: Applying the 40°C factor to an Indian catalogue already rated at 40°C. The opposite error happens too: using IEC 30°C tables with no correction on a 40°C site.
  • Forgetting grouping: One cable alone is fine. Five on a tray isn't.
  • Sizing a long run by heat alone: Check voltage drop on anything beyond a few tens of metres.
  • Coordinating the breaker with the undrated cable: In must sit below the derated Iz, not the catalogue figure.
  • Skipping the short-circuit check on a panel close to a big transformer.
  • Ignoring motor starting. Running current sizes the cable; starting current stresses the voltage.

One cable on paper is easy. Fifty, with trays and clashes in the way, is the real job. Kaarwan's MEP course trains you for that. And if you're making the jump from site to design, this 6-month plan from site electrical engineer to electrical design engineer shows how to get there.


Want mentor feedback on your calculations? Kaarwan's MEP course pairs theory with project work, so your portfolio shows real feeders, not textbook sums.

FAQs

What is the formula for cable size calculation?

There's no single formula; it's a sequence. Find load current (Ib = P / (√3 × V × pf) for three-phase), divide by derating factors to get the required table rating, then pick a size. Check voltage drop and short-circuit withstand (S ≥ I√t / k). Whichever check demands the largest cable decides.

What is a derating factor?

A derating factor is a multiplier below 1 that cuts a cable's catalogue rating to match real conditions: higher ambient temperature, grouped cables, conduit, thermal insulation or poor soil. Multiply the factors together, then multiply by the table rating to get the safe current, Iz. Hotter and more crowded means a smaller safe current.

What is the allowed voltage drop in a building?

Most designs use about 3% for lighting and 5% for power, measured from the origin of the installation to the farthest point, following IEC 60364-5-52. Older IS 732 text and some project specs ask for tighter limits, so check yours. Motor starting dips are assessed separately.

How do you choose between copper and aluminium cable?

Choose copper for small sizes, tight spaces and final circuits, since lower resistance means less voltage drop and easier terminations. Aluminium suits large feeders where weight and cost matter, but it usually needs a size or two bigger and careful bimetallic terminations. NBC cautions against aluminium below 16 mm².

What is a cable size chart?

A cable size chart is the manufacturer's table listing each conductor size in sq mm with its current rating for a given insulation, core count and laying method such as air, duct or buried. Indian XLPE charts follow IS 3961 at 40°C air. It's your starting point, so derate before trusting it.

Chat with us

Get the syllabus

View Course

Get the syllabus

View Course
curriculum-background
Phone
curriculum-background

₹3500 first call is on us 🎉

Schedule 1:1 free counselling.

  • Tailored Guidance for Your Success
  • Gain Real-World Insights
  • Life-Changing Conversation
Phone
By submitting, you agree to Kaarwan's Terms and Privacy policy

Get the syllabus

View Course

Get the syllabus

View Course
curriculum-background
Phone
curriculum-background
user-group
Not sure which skills lead to high-paying jobs?Get expert career guidance
Phone
Chat with Uswhatsapp
Priyanka

Priyanka

I’m Priyanka Choudhary, a content writer passionate about architecture, design, and turning complex ideas into clear, engaging stories.

Disclaimer: Views are the author's own and provided "as is" strictly for informational purposes. Kaarwan expressly disclaims all liability for any errors, omissions, or damages arising from this content. For corrections: hola@kaarwan.com.